Fixing stage inspection in Gables

Joinery in, painter not yet started, and the outside nearly finished.

  • Joinery, doors and trims in, before the painter starts
  • 1 to 2 hours on site
  • Report within 24 hours
Request your quoteLeave your details and an inspector rings you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage5 of 7
When to bookJoinery, doors and trims in, before the painter starts
Time on site1 to 2 hours on site
Inspected againstAS 2589 (gypsum linings), AS 3958 (tiling), the Guide to Standards and Tolerances 2017 and your contract selections

What is included in a Gables fixing inspection

  • Puddle flanges level with the shower floor
  • Flanges discharging into the outlet
  • Balcony drain installed and sized
  • Control joints free of render
  • Articulation joints where the plans show
  • Expansion joints full height
  • Service penetrations sealed
  • Gutter falls without ponding
  • Termite notice in the meter box
  • Skirtings, architraves and doors fitted
  • Cabinetry and vanity installed
  • Window sills complete
Why it matters here

Fixing inspections on Gables builds

At fixing stage in Gables the outside of the house often matters more than the inside. We have recorded render covering control joints, an articulation joint built on the wrong side of an opening, expansion joints that stop partway up a wall, and a balcony drain that was undersized or not yet connected. Inside the shower, puddle flanges standing proud of the floor.

What we find at this stage in Gables

  • Render over control joints
  • Articulation joint in the wrong place
  • Expansion joints not continuous
  • Balcony drain undersized or missing
  • Puddle flanges above floor level
Service penetrations through the brick wall left unsealed around the pipe, found during a fixing inspection in Gables
Service penetrations through the brick wall left unsealed around the pipe
Sample findings

Sample defects found during our fixing inspections in Gables

Annotated findings from Fixing inspections.

Control joint bridged by render at the front, needing a flexible sealant instead, found during a fixing inspection in Gables
Control joint bridged by render at the front, needing a flexible sealant instead
Articulation joint placed on the wrong side of an opening, away from the plans, found during a fixing inspection in Gables
Articulation joint placed on the wrong side of an opening, away from the plans
Expansion joint stopping short instead of running the full height of the wall, found during a fixing inspection in Gables
Expansion joint stopping short instead of running the full height of the wall
Balcony drain undersized for the water it has to carry away, found during a fixing inspection in Gables
Balcony drain undersized for the water it has to carry away

The other stages of a Gables build

  1. Bored piers inspection in Gables1Bored piersOnce the piers are bored, before any concrete arrives
  2. Slab pre-pour inspection in Gables2Slab pre-pourThe day before the pour, once steel and pods are set
  3. Frame inspection in Gables3FrameFrame and trusses standing, roof cover on, before sarking and linings
  4. Lock-up (pre-plaster) inspection in Gables4Lock-up (pre-plaster)Roof, cladding, windows and rough-in done, before plaster
  5. Waterproofing inspection in Gables6WaterproofingMembrane cured, before the tiler arrives
  6. Pre-handover (PCI) inspection in Gables7Pre-handover (PCI)About two weeks before your handover date

All construction stage inspections in Gables →

Guides

Construction stage guides for Gables

All guides →

Book a fixing inspection in Gables

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Fixing inspections in Gables: common questions

Why look outside at fixing stage?

Render and joint sealing are usually finishing at the same time, and joint problems are much easier to correct before the painter.

What is wrong with render over a joint?

The joint exists to let the wall move. Render bridges it, and the crack appears along that line anyway.

Is the meter box termite label looked at during fixing?

Yes. We look for it in the meter box and record it if missing.

How long is the visit?

One to two hours.

Can the builder still change a joint location?

At this stage it can be cut in where the plans show. Later it becomes a rectification.

What happens with the list?

The builder works through it before painting and we recheck at handover.