Pre-Handover (PCI) Inspections in Gables

The last full check of your Gables home, made while the final payment is still yours.

  • Room by room, then the outside
  • Safety items listed separately
  • Facade joints and weep holes
  • Balcony drainage looked at
  • Roof checked by drone
  • Booked ahead of your handover
  • Recheck before you sign off
  • Report inside 24 hours
Request your quoteLeave your details and an inspector rings you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

What is included

What is included in a Gables pre-handover (PCI) inspection

A Gables handover inspection is measured against your building contract, plans and selections, the Guide to Standards and Tolerances 2017 and the National Construction Code, with AS 3740 for internal wet areas.

Facade and joints

  • Control joints open and sealed
  • Articulation joint at height changes
  • Expansion joints continuous
  • Step cracking at openings

Weep holes

  • Present above flashings
  • Spacing within 1200mm
  • Not blocked by render
  • Not buried by soil

Balconies

  • Floor waste size
  • Membrane into the overflow
  • Tiles fully bedded
  • Fall away from the door

Roof and cappings

  • Capping falls and fixing
  • Ridge capping and flashings
  • Gutters free of ponding
  • Downpipes connected

Windows and doors

  • Upstairs opening restrictors
  • Sill and head sealing
  • Doors closing and latching
  • Rubber flashings seated

Wet areas

  • Water stop at laundry door
  • Shower falls to the waste
  • Silicone and grout finish
  • Tapware secure

Interior finish

  • Plaster joints in daylight
  • Paint coverage
  • Cornice and skirting gaps
  • Damaged surfaces

Joinery

  • Drawers running true
  • Doors aligned
  • Benchtop joins

Around the house

  • Cladding clear of the soil
  • Ground falling away
  • Isolation joints to paths

34 checkpoints across 9 areas on a standard Gables pre-handover (PCI) inspection. On the day we need safe access to the lot and the house, and a builder who knows an independent inspector is coming. Anything we cannot reach is named in the report as not inspected.

Sample findings

Sample defects from our handover inspections in Gables

Recorded at practical completion on new Gables homes.

First floor bedroom window opening wider than the 125mm child safety limit, found during a handover inspection in Gables
First floor bedroom window opening wider than the 125mm child safety limit
Balcony membrane not terminated into the overflow outlet as required, found during a handover inspection in Gables
Balcony membrane not terminated into the overflow outlet as required
Hollow balcony tiles laid on dabs of adhesive instead of a full bed, found during a handover inspection in Gables
Hollow balcony tiles laid on dabs of adhesive instead of a full bed
No articulation joint where the brickwork changes height, found during a handover inspection in Gables
No articulation joint where the brickwork changes height
Weep holes spaced more than 1200mm apart, so extra openings are needed, found during a handover inspection in Gables
Weep holes spaced more than 1200mm apart, so extra openings are needed
Control joint rendered over, needing the render cut back and the joint sealed, found during a handover inspection in Gables
Control joint rendered over, needing the render cut back and the joint sealed
No water stop at the junction between the laundry and kitchen floors, found during a handover inspection in Gables
No water stop at the junction between the laundry and kitchen floors
Step cracking in new brickwork at the corner of a front window, found during a handover inspection in Gables
Step cracking in new brickwork at the corner of a front window
Parapet capping falling the wrong way, sending water back over the wall, found during a handover inspection in Gables
Parapet capping falling the wrong way, sending water back over the wall
Cladding closer than 150mm to the soil, inviting moisture and termites, found during a handover inspection in Gables
Cladding closer than 150mm to the soil, inviting moisture and termites
Our building inspection team
Why Gables owners choose us

Independent. Licensed. Insured.

  • Slab steps checked for their extra steel
  • The 25mm rule inside every wall
  • Balconies treated as wet areas
  • Lists your supervisor can work from
Guides

Pre-Handover (PCI) Inspections guides for Gables

All guides →

Book pre-handover (pci) inspections in Gables

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Pre-Handover (PCI) Inspections in Gables: common questions

Why so many facade items at handover?

Render goes on late and covers a lot. It can hide weep holes, bridge control joints and disguise where a movement joint was never built. Those are cheap to correct before you move in and hard to get attention for afterwards.

What does spot-fixed mean on a balcony?

The tiles were stuck down on dabs of adhesive instead of a full bed. They sound hollow when tapped and tend to crack under load, and water can sit in the voids beneath them.

Which items fall outside a Gables handover inspection?

Electrical, gas and plumbing systems are not tested, appliances and air conditioning are not commissioned, and nothing is dismantled or cut open. Switchboards and wiring belong to a licensed electrician. Concealed work is reported only as far as it can be seen.